SOLDIER SYSTEM
Site Location: Samhoeup Yeongamgun, Jeonnam
The construction Name: Construction of Hyundai Samho Heavy Industries Co.,Ltd, Mokpo Ship Building #2 Dock
Ordering Organization: Hyundai Samho Heavy Industries Co.,Ltd
Constructor: Halla Construction Co.,Ltd
Subcontractor: Jaehyung Construction Co.,Ltd
Delivery Date: November 2008
FINE SOLDIER SYSTEM is possible to assemble to various heights and has the strong body. It is the system suitable for the large wall construction that is possible for concrete placing up to 6m height maximum at once.
Furthermore this system can be placing concrete without form-ties which shorten construction period and keep superior surface quality with safety.
FINE SOLDIER SYSTEM has a combination structure and can be assembled as 3.0m, 3.6m, 4.2m, 4.8m, 5.4m and 6.0m based on the concrete placing height. It can be used together with MIGHTY-6 & MIGHTY12 form panel and Uni Wall Form system just by replacement of some assembled parts and can be easily used with other foreign systems.