MIGHTY COLUMN FORM SYSTEM

  • Site Location: Jung-dong Giheung-gu Yongin-si, Gyeonggi-do

  • The construction Name: Construction of Dongbaek Apartment Industrial Facilities in Yongin

  • Constructor: Daewoo E&C Co.,Ltd

  • Subcontractor: Bogwang geoneop(Construction) Co.,Ltd

  • Delivery Date: April 2009


FINE MIGHTY WALL & COLUMN FORM SYSTEM use the same panel and accessories as concrete wall form and column form and can be formed just by replacing a clamp. It is a real economical system by being used with no double materials and higher compatibility of making various size of columns by adjusting at 50mm intervals according to the size of columns.

FINE MIGHTY COLUMN FORM SYSTEM can complete panel assembly by clamping a few panel clamps at each corners without using form-ties and even tall columns higher than 6 meters can constructed promptly with a small number of workers. This is a certified product for economical feasibility by the superior surface of concrete which is no need another finishing works.