Comprehensive Experimental Building, Tsinghua University

Project data


Location: Beijing,China

Constrution Name:Comprehensive Experimental Building, Tsinghua University

Delivery Date: Oct 2019

A comprehensive building, engineering for frame shear wall structure. 

A total of 18 storeys, 4 of them below ground level and 14 above ground

Complex building structure covering a total area of  141,000 m2, with varying storey heights

Custom:Beijing Construction Engineering Group

Requirments

Short construction time

High quality of the concrete work

Some wall formworks are going to be used

about 60 times

Quickly understood and with little training

Same as the cost of traditional methods

Systems in use

Slab forms

Smart6 wall formworks

Mighty wall formworks

LFT panels

Customer's benefit

Fast working with the hand-set formwork system

Cost-effective wall formwork solution due to almost 60 times cycles